Geneva Optimization 0.8.2 "Route De Broglie"

Milestone information

Project:
Geneva Optimization
Series:
trunk
Version:
0.8.2
Code name:
Route De Broglie
Released:
2010-09-08  
Registrant:
ariel
Release registered:
2010-09-08
Active:
No. Drivers cannot target bugs and blueprints to this milestone.  

Download RDF metadata

Activities

Assigned to you:
No blueprints or bugs assigned to you.
Assignees:
No users assigned to blueprints and bugs.
Blueprints:
No blueprints are targeted to this milestone.
Bugs:
No bugs are targeted to this milestone.

Download files for this release

After you've downloaded a file, you can verify its authenticity using its MD5 sum or signature. (How do I verify a download?)

File Description Downloads
download icon geneva-v0.8.2.tgz (md5, sig) Geneva v0.8.2 (Route De Broglie) 20
last downloaded 46 weeks ago
download icon geneva-v0.8.2-ReleaseNotes.txt (md5, sig) Geneva v0.8.2 Release Notes 12
last downloaded 45 weeks ago
Total downloads: 32

Release notes 

Geneva Optimization Library

* Version 0.8.2, "Route De Broglie" - September 8, 2010

See the Changelog for the individual changes.

Changelog 

View the full changelog

The main changes for this release include:
 - Gave GParameterSet objects the ability to distribute its local random number
   generator to the GParameterBase objects stored in it.
 - Renamed GDouble to GDoubleObject, GInt32 to GInt32Object, GBoolean to GBooleanObject,
   GConstrainedDouble to GConstrainedDoubleObject and GConstrainedInt32 to GConstrainedInt32Object
   for better consistency with class names like GDoubleObjectCollection and GDoubleCollection
 - Renamed GParameterBaseWithAdaptorsT<T>::adaptor_cast<adaptor_type> to getAdaptor<adaptor_type>
 - Renamed GParameterSet::pc_at<> to at<> for consistency reasons
 - Added many additional tests

0 blueprints and 0 bugs targeted

There are no feature specifications or bug tasks targeted to this milestone. The project's maintainer, driver, or bug supervisor can target specifications and bug tasks to this milestone to track the things that are expected to be completed for the release.

This milestone contains Public information
Everyone can see this information.