Activities

Assigned to you:
No blueprints or bugs assigned to you.
Assignees:
6 Christophe CHAUVET
Blueprints:
No blueprints are targeted to this milestone.
Bugs:
6 Fix Released

0 blueprints and 6 bugs targeted

Bug report Project Importance Assignee Status
834447 #834447 Bad begining sequence when there only on document 6.0 6.0 2 Critical Christophe CHAUVET  10 Fix Released
834447 #834447 Bad begining sequence when there only on document JasperReport Server Connector JasperReport Server Connector 2 Critical Christophe CHAUVET  10 Fix Released
840613 #840613 Cannot reload print document from attachment 6.0 6.0 2 Critical Christophe CHAUVET  10 Fix Released
840613 #840613 Cannot reload print document from attachment JasperReport Server Connector JasperReport Server Connector 2 Critical Christophe CHAUVET  10 Fix Released
813501 #813501 bug when duplicating a jasper.document 6.0 6.0 3 High Christophe CHAUVET  10 Fix Released
813501 #813501 bug when duplicating a jasper.document JasperReport Server Connector JasperReport Server Connector 3 High Christophe CHAUVET  10 Fix Released