I just have tested the wizard, the entry date and the entry period are still set to current date.
For example, if I confirm a subscription on december,30th that should generate an entry for november,1st (the subscription line date is generated for november,1st), date is set to december 30th and period is set to 12/2009 for both entry and entry lines.
The date should be set to november,1st and period to 11/2009 for both entry and entry lines
Hello
I just have tested the wizard, the entry date and the entry period are still set to current date.
For example, if I confirm a subscription on december,30th that should generate an entry for november,1st (the subscription line date is generated for november,1st), date is set to december 30th and period is set to 12/2009 for both entry and entry lines.
The date should be set to november,1st and period to 11/2009 for both entry and entry lines
Regards