Log in / Register
Ubuntu
hostname package
Overview
Code
Bugs
Blueprints
Translations
Answers
Builds for hostname in Ubuntu Oracular
Oracular (24.10)
Builds
Successfully built
Failed to build
Dependency wait
Chroot problem
Build for superseded Source
Failed to upload
All states
Currently building
Needs building
1
→
7
of 7 results
First
•
Previous
•
Next
•
Last
s390x build of hostname 3.23+nmu2ubuntu2 in ubuntu noble PROPOSED
Build started
on 2024-04-08
on
bos02-s390x-017
and finished
on 2024-04-08
taking 3 minutes —
see the log
riscv64 build of hostname 3.23+nmu2ubuntu2 in ubuntu noble PROPOSED
Build started
on 2024-04-08
on
bos03-riscv64-068
and finished
on 2024-04-08
taking 13 minutes —
see the log
ppc64el build of hostname 3.23+nmu2ubuntu2 in ubuntu noble PROPOSED
Build started
on 2024-04-08
on
bos02-ppc64el-024
and finished
on 2024-04-08
taking 2 minutes —
see the log
i386 build of hostname 3.23+nmu2ubuntu2 in ubuntu noble PROPOSED
Build started
on 2024-04-08
on
lcy02-amd64-118
and finished
on 2024-04-08
taking 2 minutes —
see the log
armhf build of hostname 3.23+nmu2ubuntu2 in ubuntu noble PROPOSED
Build started
on 2024-04-08
on
bos01-arm64-039
and finished
on 2024-04-08
taking 2 minutes —
see the log
arm64 build of hostname 3.23+nmu2ubuntu2 in ubuntu noble PROPOSED
Build started
on 2024-04-08
on
bos03-arm64-001
and finished
on 2024-04-08
taking 2 minutes —
see the log
amd64 build of hostname 3.23+nmu2ubuntu2 in ubuntu noble PROPOSED
Build started
on 2024-04-08
on
lcy02-amd64-109
and finished
on 2024-04-08
taking 2 minutes —
see the log
1
→
7
of 7 results
First
•
Previous
•
Next
•
Last